Design World

  • Home
  • Technologies
    • 3D CAD
    • Electronics • electrical
    • Fastening & Joining
    • Factory automation
    • Linear Motion
    • Motion Control
    • Test & Measurement
    • Sensors
    • Fluid power
  • Learn
    • Ebooks / Tech Tips
    • Engineering Week
    • Future of Design Engineering
    • MC² Motion Control Classrooms
    • Podcasts
    • Videos
    • Webinars
  • LEAP AWARDS
  • Leadership
    • 2022 Voting
    • 2021 Winners
  • Design Guide Library
  • Resources
    • 3D Cad Models
      • PARTsolutions
      • TraceParts
    • Digital Issues
      • Design World
      • EE World
    • Women in Engineering
  • Supplier Listings

AT&T to decide on T-Mobile deal by Jan. 12

By atesmeh | December 13, 2011

Share

A judge agreed Monday to put legal proceedings in the Department of Justice’s antitrust case against AT&T’s merger with T-Mobile USA on hold until Jan. 18 as the operator scrambles to salvage the deal.

The order gives AT&T until Jan. 12 to tell the court whether it plans to abandon the deal or try to pass an alternate proposal.

AT&T also will have to provide an update on its plans for getting the acquisition passed by the FCC, which must sign off on the deal before it can close.

Judge Ellen Huvelle granted the stay on the request of AT&T and the DOJ. The two sides will appear in court on Jan. 18 to determine how to proceed.

The DOJ was ordered on Friday to file a motion to stay the case or withdraw it by Tuesday, but today’s order means the regulator won’t be submitting its motion to the court tomorrow. The order also vacates a Thursday hearing on the DOJ’s now-void motion.

During the status hearing last week, AT&T attempted to lay out a scenario to save the transaction. Attorney Michael Hansen said that “nothing had changed” in the wake of the withdrawal of AT&T’s merger application from the FCC.

Hansen also said the company may be able to meet the deal’s September 2012 drop-dead date if it is able to reach a settlement with the DOJ and get quick FCC approval.

Huvelle was skeptical of AT&T’s claim that the status of the deal was unchanged and questioned whether it was still necessary to move forward with an expedited process.

AT&T pulled its FCC application for the transfer of T-Mobile’s spectrum licenses last month in an attempt to avoid an administrative hearing on the deal and focus its efforts on reaching a settlement with the DOJ.

The move didn’t go over well during the hearing on Friday, with the court questioning whether the deal was even still active without an application pending at the FCC. AT&T will have to re-file its merger application if it is able to reach a settlement for the deal.


Filed Under: Industry regulations

 

Related Articles Read More >

ids-industrial-camera-manufacturer.sustainability-3
IDS focuses on sustainability in shipping
Part 5: Motion control + MQTT, OPC-UA, and other protocols for cloud services
Facebook CEO Zuckerberg Calls for More Outside Regulation
Musk’s Boring Company Calls it Quits on LA Tunnel, Instead Focuses on Hyperloop

DESIGN GUIDE LIBRARY

“motion

Enews Sign Up

Motion Control Classroom

Design World Digital Edition

cover

Browse the most current issue of Design World and back issues in an easy to use high quality format. Clip, share and download with the leading design engineering magazine today.

EDABoard the Forum for Electronics

Top global problem solving EE forum covering Microcontrollers, DSP, Networking, Analog and Digital Design, RF, Power Electronics, PCB Routing and much more

EDABoard: Forum for electronics

Sponsored Content

  • Global supply needs drive increased manufacturing footprint development
  • How to Increase Rotational Capacity for a Retaining Ring
  • Cordis high resolution electronic proportional pressure controls
  • WAGO’s custom designed interface wiring system making industrial applications easier
  • 10 Reasons to Specify Valve Manifolds
  • Case study: How a 3D-printed tool saved thousands of hours and dollars

Design World Podcasts

May 17, 2022
Another view on additive and the aerospace industry
See More >
Engineering Exchange

The Engineering Exchange is a global educational networking community for engineers.

Connect, share, and learn today »

Design World
  • Advertising
  • About us
  • Contact
  • Manage your Design World Subscription
  • Subscribe
  • Design World Digital Network
  • Engineering White Papers
  • LEAP AWARDS

Copyright © 2022 WTWH Media LLC. All Rights Reserved. The material on this site may not be reproduced, distributed, transmitted, cached or otherwise used, except with the prior written permission of WTWH Media
Privacy Policy | Advertising | About Us

Search Design World

  • Home
  • Technologies
    • 3D CAD
    • Electronics • electrical
    • Fastening & Joining
    • Factory automation
    • Linear Motion
    • Motion Control
    • Test & Measurement
    • Sensors
    • Fluid power
  • Learn
    • Ebooks / Tech Tips
    • Engineering Week
    • Future of Design Engineering
    • MC² Motion Control Classrooms
    • Podcasts
    • Videos
    • Webinars
  • LEAP AWARDS
  • Leadership
    • 2022 Voting
    • 2021 Winners
  • Design Guide Library
  • Resources
    • 3D Cad Models
      • PARTsolutions
      • TraceParts
    • Digital Issues
      • Design World
      • EE World
    • Women in Engineering
  • Supplier Listings