Design World

  • Home
  • Technologies
    • 3D CAD
    • Electronics • electrical
    • Fastening & Joining
    • Factory automation
    • Linear Motion
    • Motion Control
    • Test & Measurement
    • Sensors
    • Fluid power
  • Learn
    • Ebooks / Tech Tips
    • Engineering Week
    • Future of Design Engineering
    • MC² Motion Control Classrooms
    • Podcasts
    • Videos
    • Webinars
  • LEAP AWARDS
  • Leadership
    • 2022 Voting
    • 2021 Winners
  • Design Guide Library
  • Resources
    • Subscribe!
    • 3D Cad Models
      • PARTsolutions
      • TraceParts
    • Digital Issues
      • Design World
      • EE World
    • Women in Engineering
  • Supplier Listings

Details About the 3 Officials Charged in Flint Water Crisis

By Tammy Webber, Associated Press | April 20, 2016

Share

In a July 22, 2013 photo, Michael Glasgow, laboratory water quality supervisor, tests water for bacteria and pH levels, among other tests, at the Flint water plant in Flint, Mich. (Jake May/The Flint Journal-MLive.com via AP)

The first criminal charges have been filed in Flint’s lead-tainted water crisis, including allegations that two state regulators and a Flint water plant supervisor tampered with evidence and that the state regulators knowingly misled U.S. Environmental Protection Agency officials and the county health department.

The Michigan city switched from Detroit’s drinking water system to the Flint River in April 2014 as a cost-saving measure, but failed to treat river water with corrosion-control chemicals — an omission that allowed lead to leach from aging pipes and fixtures and contaminate tap water for 18 months.

Here’s who was charged Wednesday and their connections to the crisis:

MICHAEL GLASGOW, Flint utilities administrator:

He testified last month before a state legislative committee that he intended to treat the Flint River water with anti-corrosive chemicals but was overruled by state Department of Environmental Quality engineer Michael Prysby, who told him a year of water testing was required first.

Eight days before the switch, Glasgow wrote to a DEQ official on April 17, 2014, complaining that his supervisors were prodding him to move too quickly and that his staff needed more training.

“If water is distributed from this plant in the next couple weeks, it will be against my direction,” wrote Glasgow, then the city’s laboratory and water quality supervisor. “I need time to adequately train additional staff and to update our monitoring plans before I will feel we are ready … I will reiterate this to management above me, but they seem to have their own agenda.”

Glasgow, who was placed on leave Wednesday, is charged with tampering with evidence for changing lead water-testing results and willful neglect of duty as a public servant. It was unclear if he’s getting paid while on leave.

MICHAEL PRYSBY, former district engineer in the DEQ’s Office of Drinking Water and Municipal Assistance:

Prysby misinterpreted federal drinking-water rules and told Flint officials that the plant didn’t need to add chemicals to prevent lead from leaching into water from old service lines.

He took another job within the DEQ on March 28, the day before Glasgow testified. The DEQ has said his switch was not a forced transfer.

Prysby, who was suspended without pay Wednesday, has been charged with misconduct in office, conspiracy to tamper with evidence, tampering with evidence — including manipulating monitoring reports — and violations of water treatment and monitoring laws.

STEPHEN BUSCH, former district supervisor in the DEQ’s drinking water program:

After the EPA began questioning the DEQ about the use of corrosion-control chemicals, Busch said in a February 2015 email that Flint had “an optimized corrosion-control program.”

Busch also knew about a surge in Legionnaires’ disease potentially linked to the water switch long before the governor reported the increase to the public in January, but downplayed any connection. There were at least 91 cases, including 12 deaths, in Genesee County, where Flint is located, during a 17-month period.

In a March 13, 2015, email to a Genesee County Health Department official, Busch said it was “highly unlikely that legionella would be present in treated water” and that any evidence to the contrary appeared “premature and prejudice (sic) toward that end.”

He was suspended without pay Wednesday. He previously was on paid leave from his position as the state Office of Drinking Water’s Lansing and Jackson district supervisor after being suspended in January.

Busch has been charged with misconduct in office, conspiracy to tamper with evidence, tampering with evidence and violations of water treatment and monitoring laws.


Filed Under: Infrastructure

 

Related Articles Read More >

Do Sensors Make Infrastructure Safer?
Crawling Robots and Flying Drones May Help Missouri’s Bridges
Viasat and Facebook Collaborate to Expand Internet Connectivity in Rural Mexico
Smartphone-Based System to Monitor America’s Crumbling Infrastructure

DESIGN GUIDE LIBRARY

“motion

Enews Sign Up

Motion Control Classroom

Design World Digital Edition

cover

Browse the most current issue of Design World and back issues in an easy to use high quality format. Clip, share and download with the leading design engineering magazine today.

EDABoard the Forum for Electronics

Top global problem solving EE forum covering Microcontrollers, DSP, Networking, Analog and Digital Design, RF, Power Electronics, PCB Routing and much more

EDABoard: Forum for electronics

Sponsored Content

  • Industrial disc pack couplings
  • Pushing performance: Adding functionality to terminal blocks
  • Get to Know Würth Industrial Division
  • Renishaw next-generation FORTiS™ enclosed linear encoders offer enhanced metrology and reliability for machine tools
  • WAGO’s smartDESIGNER Online Provides Seamless Progression for Projects
  • Epoxy Certified for UL 1203 Standard

Design World Podcasts

July 26, 2022
Tech Tuesdays: Sorbothane marks 40 years of shock and vibration innovation
See More >
Engineering Exchange

The Engineering Exchange is a global educational networking community for engineers.

Connect, share, and learn today »

Design World
  • Advertising
  • About us
  • Contact
  • Manage your Design World Subscription
  • Subscribe
  • Design World Digital Network
  • Engineering White Papers
  • LEAP AWARDS

Copyright © 2022 WTWH Media LLC. All Rights Reserved. The material on this site may not be reproduced, distributed, transmitted, cached or otherwise used, except with the prior written permission of WTWH Media
Privacy Policy | Advertising | About Us

Search Design World

  • Home
  • Technologies
    • 3D CAD
    • Electronics • electrical
    • Fastening & Joining
    • Factory automation
    • Linear Motion
    • Motion Control
    • Test & Measurement
    • Sensors
    • Fluid power
  • Learn
    • Ebooks / Tech Tips
    • Engineering Week
    • Future of Design Engineering
    • MC² Motion Control Classrooms
    • Podcasts
    • Videos
    • Webinars
  • LEAP AWARDS
  • Leadership
    • 2022 Voting
    • 2021 Winners
  • Design Guide Library
  • Resources
    • Subscribe!
    • 3D Cad Models
      • PARTsolutions
      • TraceParts
    • Digital Issues
      • Design World
      • EE World
    • Women in Engineering
  • Supplier Listings