Design World

  • Home
  • Technologies
    • ELECTRONICS • ELECTRICAL
    • Fastening • joining
    • FLUID POWER
    • LINEAR MOTION
    • MOTION CONTROL
    • SENSORS
    • TEST & MEASUREMENT
    • Factory automation
    • Warehouse automation
    • DIGITAL TRANSFORMATION
  • Learn
    • Tech Toolboxes
    • Learning center
    • eBooks • Tech Tips
    • Podcasts
    • Videos
    • Webinars • general engineering
    • Webinars • Automated warehousing
    • Voices
  • LEAP Awards
  • 2026 Leadership
    • 2025 Winners
    • 2024 Winners
    • 2023 Winners
    • 2022 Winners
    • 2021 Winners
  • Design Guides
  • Resources
    • 3D Cad Models
      • PARTsolutions
      • TraceParts
    • Digital Issues
      • Design World
      • EE World
    • Educational Assets
    • Engineering diversity
    • Reports
    • Trends
  • Supplier Listings
  • Advertise
  • SUBSCRIBE
    • MAGAZINE
    • NEWSLETTER

Dish pitches revised LTE plan

By atesmeh | January 24, 2012

Dish Network pitched a revised plan for its yet-unapproved mobile broadband network to FCC officials last week, according to ex parte documents posted Monday to the agency’s website.

The satellite television company is pushing the FCC to grant it a waiver for land-based mobile broadband service in spectrum currently restricted to satellite use, similar to the hotly contested waiver granted to LightSquared last year.

Dish acquired the spectrum through its purchase of bankrupt satellite communications companies TerreStar and DBSD North America last year.

During the Jan. 18 meeting, Dish Network executive vice president Thomas Cullen and four of its attorneys presented a “detailed proposal” on a “revised build-out schedule keyed to commercial availability of the LTE Advanced standard” to the FCC.

Rick Kaplan, the head of the FCC’s wireless bureau, attended the meeting, as did top officials from the agency’s international bureau and office of engineering and technology.

A Dish Network spokesman declined to answer questions about the changes, and no further details about the revisions were disclosed in the filing.

Formal changes to Dish Network’s original plan would have to be made part of the public record. Since the revisions haven’t been posted, the latest proposal is likely part of the company’s ongoing negotiations with the FCC.

Dish Network had previously said it was “committed to developing a build-out schedule consistent with FCC precedent and based on the build-out principles established in the Sprint/Nextel and Sprint/Clearwire transaction decisions.”

The FCC required Clearwire to cover 15 million people within four years and 30 million people within six years, a far more lenient requirement than the 100 million people LightSquared is supposed to cover by the end of this year as part of the conditions to get its waiver for land-based base stations.

Dish also said in its original plan it wanted to use LTE Advanced, even though the standard hadn’t been ratified at the time it made the proposal. The construction of the network would be “keyed to commercial availability of the LTE Advanced standard,” Dish said in its original proposal.

BTIG Research analyst Walter Piecyk says it would be a mistake to assume that Dish Network is accelerating its deployment plans because of the International Telecommunications Union’s recent finalization of LTE Advanced standards.

“The problem is ‘revised’ can mean anything,” Piecyk says. “The temptation is to assume that ‘revised’ means they’ll start the clock and it will be a more aggressive schedule than they had previously planned … but we don’t know whether they’ve revised up or down.”

The timing of Dish Network’s latest proposal came just days after federal officials said there were “no practical solutions” for the GPS interference problem blocking the launch of LightSquared’s network, putting pressure on the FCC’s pledge to expand broadband access.

The blowup over LightSquared, combined with verbal sparring from AT&T over the agency’s handling of spectrum auctions, could give Dish Network the leverage it needs to make additional demands, Piecyk says.

Still, what those demands are is anybody’s guess.

“They’re just trying to negotiate,” Piecyk says.

You might also like


Filed Under: Industry regulations + certifications

 

LEARNING CENTER

Design World Learning Center
“dw
EXPAND YOUR KNOWLEDGE AND STAY CONNECTED
Get the latest info on technologies, tools and strategies for Design Engineering Professionals.
Motor University

Design World Digital Edition

cover

Browse the most current issue of Design World and back issues in an easy to use high quality format. Clip, share and download with the leading design engineering magazine today.

EDABoard the Forum for Electronics

Top global problem solving EE forum covering Microcontrollers, DSP, Networking, Analog and Digital Design, RF, Power Electronics, PCB Routing and much more

EDABoard: Forum for electronics

Sponsored Content

  • From film to tape: Engineering for low outgassing in space
  • For the machines that don’t take days off. How Electrification Is Reshaping On- and Off-Road Machinery.
  • CASE STUDY: Inside ThredUp’s High-Tech Transformation of Its Four-Story Conveyor System
  • Performance Starts with Precision Cuts
  • eBook: Setting The Standard For Precise Alignment
  • How Concentric Maxi Torque Bushings Speed the Deployment of High-Precision Machines
View More >>
Engineering Exchange

The Engineering Exchange is a global educational networking community for engineers.

Connect, share, and learn today »

Design World
  • About us
  • Contact
  • Manage your Design World Subscription
  • Subscribe
  • Design World Digital Network
  • Control Engineering
  • Consulting-Specifying Engineer
  • Plant Engineering
  • Engineering White Papers
  • Leap Awards

Copyright © 2026 WTWH Media LLC. All Rights Reserved. The material on this site may not be reproduced, distributed, transmitted, cached or otherwise used, except with the prior written permission of WTWH Media
Privacy Policy | Advertising | About Us

Search Design World

  • Home
  • Technologies
    • ELECTRONICS • ELECTRICAL
    • Fastening • joining
    • FLUID POWER
    • LINEAR MOTION
    • MOTION CONTROL
    • SENSORS
    • TEST & MEASUREMENT
    • Factory automation
    • Warehouse automation
    • DIGITAL TRANSFORMATION
  • Learn
    • Tech Toolboxes
    • Learning center
    • eBooks • Tech Tips
    • Podcasts
    • Videos
    • Webinars • general engineering
    • Webinars • Automated warehousing
    • Voices
  • LEAP Awards
  • 2026 Leadership
    • 2025 Winners
    • 2024 Winners
    • 2023 Winners
    • 2022 Winners
    • 2021 Winners
  • Design Guides
  • Resources
    • 3D Cad Models
      • PARTsolutions
      • TraceParts
    • Digital Issues
      • Design World
      • EE World
    • Educational Assets
    • Engineering diversity
    • Reports
    • Trends
  • Supplier Listings
  • Advertise
  • SUBSCRIBE
    • MAGAZINE
    • NEWSLETTER