Design World

  • Home
  • Technologies
    • 3D CAD
    • Electronics • electrical
    • Fastening & Joining
    • Factory automation
    • Linear Motion
    • Motion Control
    • Test & Measurement
    • Sensors
    • Fluid power
  • Learn
    • Ebooks / Tech Tips
    • Engineering Week
    • Future of Design Engineering
    • MC² Motion Control Classrooms
    • Podcasts
    • Videos
    • Webinars
  • LEAP AWARDS
  • Leadership
    • 2022 Voting
    • 2021 Winners
  • Design Guide Library
  • Resources
    • 3D Cad Models
      • PARTsolutions
      • TraceParts
    • Digital Issues
      • Design World
      • EE World
    • Women in Engineering
  • Supplier Listings

Exxon: Report Blames Pipeline Bust on Defects

By atesmeh | July 11, 2013

Share

An independent report blames manufacturing defects for the failure of an Exxon Mobil Corp. pipeline that sent 150,000 gallons of crude oil into the small town of Mayflower, the company said Wednesday.

The report, provided to Exxon and the Pipeline and Hazardous Materials Safety Administration, found cracks near a seam that failed on the ruptured Pegasus Pipeline, the company said. Both Exxon and the regulatory agency declined to release the report, which was produced by Hurst Metallurgical Research Laboratory Inc.

The company said the defects identified in the report reflect the “root cause of the failure.” Exxon said it is still conducting tests to evaluate other possible factors in the March 29 spill, which forced more than 20 families from their homes. The cleanup is continuing and the pipeline remains shut down.

“Based on the metallurgical analysis, the independent laboratory concluded that the root cause of the failure can be attributed to original manufacturing defects — namely hook cracks near the seam.” Exxon said in a news release. “Additional contributing factors include atypical pipe properties, such as extremely low impact toughness and elongation properties across the … seam.”

“We are still conducting supplemental testing, which will help us understand all factors associated with the pipe failure and allow for the verification of the integrity of the Pegasus Pipeline. These tests will help us determine the mitigation steps we need to take to ensure a similar incident does not occur again,” the company said.

Exxon said, citing the report, that corrosion wasn’t a contributing factor to the spill.

Oil from the pipeline flowed through a neighborhood and into a cove that’s part of Lake Conway. The company says testing showed that oil did not extend into the main body of the lake.

Attorney General Dustin McDaniel said last month that there is no distinction between the cove and the lake. McDaniel and U.S. Attorney Christopher Thyer filed a joint lawsuit seeking $45,000 per day in penalties for the effects of the spill.

McDaniel said the spill itself was a violation of state and federal law and that it badly disrupted the lives of the people who were displaced.

However, Thyer stopped short of saying the company was negligent or willful in any misconduct. Among other things, the lawsuit accused Exxon of improperly storing liquids recovered from the site.

The company said last month that it recovered all visible, free-standing oil from the spill site but that it would take months for the cleanup to be completed.

Mayflower is about 25 miles northwest of Little Rock.


Filed Under: Industrial automation

 

Related Articles Read More >

Festo and the power of worker upskilling at the Oracle Industry Lab
Five ways to drive ROI from personnel and cobot investments
Safety Air Guns use engineered air nozzles for high performance
EXAIR’s new no drip siphon fed spray nozzle coats, cools and cleans

DESIGN GUIDE LIBRARY

“motion

Enews Sign Up

Motion Control Classroom

Design World Digital Edition

cover

Browse the most current issue of Design World and back issues in an easy to use high quality format. Clip, share and download with the leading design engineering magazine today.

EDABoard the Forum for Electronics

Top global problem solving EE forum covering Microcontrollers, DSP, Networking, Analog and Digital Design, RF, Power Electronics, PCB Routing and much more

EDABoard: Forum for electronics

Sponsored Content

  • Pushing performance: Adding functionality to terminal blocks
  • Get to Know Würth Industrial Division
  • Renishaw next-generation FORTiS™ enclosed linear encoders offer enhanced metrology and reliability for machine tools
  • WAGO’s smartDESIGNER Online Provides Seamless Progression for Projects
  • Epoxy Certified for UL 1203 Standard
  • The Importance of Industrial Cable Resistance to Chemicals and Oils

Design World Podcasts

June 12, 2022
How to avoid over engineering a part
See More >
Engineering Exchange

The Engineering Exchange is a global educational networking community for engineers.

Connect, share, and learn today »

Design World
  • Advertising
  • About us
  • Contact
  • Manage your Design World Subscription
  • Subscribe
  • Design World Digital Network
  • Engineering White Papers
  • LEAP AWARDS

Copyright © 2022 WTWH Media LLC. All Rights Reserved. The material on this site may not be reproduced, distributed, transmitted, cached or otherwise used, except with the prior written permission of WTWH Media
Privacy Policy | Advertising | About Us

Search Design World

  • Home
  • Technologies
    • 3D CAD
    • Electronics • electrical
    • Fastening & Joining
    • Factory automation
    • Linear Motion
    • Motion Control
    • Test & Measurement
    • Sensors
    • Fluid power
  • Learn
    • Ebooks / Tech Tips
    • Engineering Week
    • Future of Design Engineering
    • MC² Motion Control Classrooms
    • Podcasts
    • Videos
    • Webinars
  • LEAP AWARDS
  • Leadership
    • 2022 Voting
    • 2021 Winners
  • Design Guide Library
  • Resources
    • 3D Cad Models
      • PARTsolutions
      • TraceParts
    • Digital Issues
      • Design World
      • EE World
    • Women in Engineering
  • Supplier Listings