Design World

  • Home
  • Technologies
    • ELECTRONICS • ELECTRICAL
    • Fastening • joining
    • FLUID POWER
    • LINEAR MOTION
    • MOTION CONTROL
    • SENSORS
    • TEST & MEASUREMENT
    • Factory automation
    • Warehouse automation
    • DIGITAL TRANSFORMATION
  • Learn
    • Tech Toolboxes
    • Learning center
    • eBooks • Tech Tips
    • Podcasts
    • Videos
    • Webinars • general engineering
    • Webinars • Automated warehousing
    • Voices
  • LEAP Awards
  • 2025 Leadership
    • 2024 Winners
    • 2023 Winners
    • 2022 Winners
    • 2021 Winners
  • Design Guides
  • Resources
    • 3D Cad Models
      • PARTsolutions
      • TraceParts
    • Digital Issues
      • Design World
      • EE World
    • Educational Assets
    • Engineering diversity
    • Reports
    • Trends
  • Supplier Listings
  • Advertise
  • SUBSCRIBE
    • MAGAZINE
    • NEWSLETTER

Launch Pad Where Rocket Exploded Back Next Year

By atesmeh | December 18, 2014

Despite a massive explosion in October, authorities say a state-owned launch pad at NASA’s Wallops Flight Facility should be repaired and ready for testing late next year.

Orbital Sciences’ Antares rocket exploded seconds after liftoff from Wallops Island on the Eastern Shore of Virginia on Oct. 28. The rocket was carrying a cargo ship that was bound for the International Space Station.

The Virginia Commercial Spaceflight Authority on Wednesday provided news media outlets a tour of the damage from the explosion. Two lightning towers at the launch pad were knocked down by the blast while the two others suffered damage and will need to be replaced.

A water tower next to the launch pad was slightly charred and had exterior lighting damaged, but otherwise withstood the blast. A large crater was created in the sand next to the launch pad from the blast where the rocket came down.

Two nearby buildings scheduled to be removed prior to the explosion were also damaged, but the vast majority of the complex was unscathed.

“This pad has come through in very good shape. It’s still some significant repairs, but it’s a $120 million pad and the repairs are less than $20 million,” said Dale Nash, executive director of the Virginia Commercial Spaceflight Authority.

Environmental Remediation

NASA says no environmental hazards were discovered in the air following the explosion. The space agency says the water-retention basins at the launch pad have been pumped dry and will be cleaned to prevent future contamination.

The impact crater was pumped dry five times to remove what NASA describes as significant levels for perchlorate. Additional pumping will continue, and water samples will be taken each time.

The pumped water is being kept in large, enclosed storage tanks and will be taken to an off-site treatment facility. Soil near the crater is also being excavated to remove any residual chemicals, which will also be taken to an off-site disposal facility.

Future Launches

Orbital Sciences plans to launch its next Antares rocket carrying supplies to the International Space Station in 2016. The Virginia Commercial Spaceflight Authority says the launch pad should be able to conduct what’s known as a hot-fire test at the launch pad by the end of 2015 in anticipation of the launch.

Repair Costs

The Virginia Commercial Spaceflight Authority has said repairs to the launch pad should not exceed $20 million. Congress has agreed to pick up the tab for those costs. U.S. Sen. Tim Kaine, D-Va., toured the launch pad on Wednesday and said it is of national interest to see the facility repaired as quickly as possible.

“This infrastructure survived remarkably well, given the magnitude of the challenge,” Kaine said. “But there’s obviously a cost to repair. The missions that are flown here are very necessary. The mission that is being done serving the space station and other missions here definitely have a public component.”

You might also like


Filed Under: Aerospace + defense

 

LEARNING CENTER

Design World Learning Center
“dw
EXPAND YOUR KNOWLEDGE AND STAY CONNECTED
Get the latest info on technologies, tools and strategies for Design Engineering Professionals.
Motor University

Design World Digital Edition

cover

Browse the most current issue of Design World and back issues in an easy to use high quality format. Clip, share and download with the leading design engineering magazine today.

EDABoard the Forum for Electronics

Top global problem solving EE forum covering Microcontrollers, DSP, Networking, Analog and Digital Design, RF, Power Electronics, PCB Routing and much more

EDABoard: Forum for electronics

Sponsored Content

  • Five Uses for the Parvalux Modular Range
  • Robot Integration with Rotary Index Tables and Auxiliary Axes
  • How to Choose the Right Rotary Index Table for Your Application
  • Designing a Robust Rotary Index Table: Engineering Best Practices for Long-Term Performance
  • Custom Integration Options for your New and Existing Rotary Table Applications
  • How Apple Rubber’s Rapid Prototyping Kept Whale Research Afloat
View More >>
Engineering Exchange

The Engineering Exchange is a global educational networking community for engineers.

Connect, share, and learn today »

Design World
  • About us
  • Contact
  • Manage your Design World Subscription
  • Subscribe
  • Design World Digital Network
  • Control Engineering
  • Consulting-Specifying Engineer
  • Plant Engineering
  • Engineering White Papers
  • Leap Awards

Copyright © 2026 WTWH Media LLC. All Rights Reserved. The material on this site may not be reproduced, distributed, transmitted, cached or otherwise used, except with the prior written permission of WTWH Media
Privacy Policy | Advertising | About Us

Search Design World

  • Home
  • Technologies
    • ELECTRONICS • ELECTRICAL
    • Fastening • joining
    • FLUID POWER
    • LINEAR MOTION
    • MOTION CONTROL
    • SENSORS
    • TEST & MEASUREMENT
    • Factory automation
    • Warehouse automation
    • DIGITAL TRANSFORMATION
  • Learn
    • Tech Toolboxes
    • Learning center
    • eBooks • Tech Tips
    • Podcasts
    • Videos
    • Webinars • general engineering
    • Webinars • Automated warehousing
    • Voices
  • LEAP Awards
  • 2025 Leadership
    • 2024 Winners
    • 2023 Winners
    • 2022 Winners
    • 2021 Winners
  • Design Guides
  • Resources
    • 3D Cad Models
      • PARTsolutions
      • TraceParts
    • Digital Issues
      • Design World
      • EE World
    • Educational Assets
    • Engineering diversity
    • Reports
    • Trends
  • Supplier Listings
  • Advertise
  • SUBSCRIBE
    • MAGAZINE
    • NEWSLETTER
We use cookies to personalize content and ads, to provide social media features, and to analyze our traffic. We share information about your use of our site with our social media, advertising, and analytics partners who may combine it with other information you’ve provided to them or that they’ve collected from your use of their services. You consent to our cookies if you continue to use this website.