Design World

  • Home
  • Technologies
    • 3D CAD
    • Electronics • electrical
    • Fastening & Joining
    • Factory automation
    • Linear Motion
    • Motion Control
    • Test & Measurement
    • Sensors
    • Fluid power
  • Learn
    • Ebooks / Tech Tips
    • Engineering Week
    • Future of Design Engineering
    • MC² Motion Control Classrooms
    • Podcasts
    • Videos
    • Webinars
  • LEAP AWARDS
  • Leadership
    • 2022 Voting
    • 2021 Winners
  • Design Guide Library
  • Resources
    • 3D Cad Models
      • PARTsolutions
      • TraceParts
    • Digital Issues
      • Design World
      • EE World
    • Women in Engineering
  • Supplier Listings

Mars Spacecraft’s First Missions Face Delays, NASA Says

By Phys.org | April 17, 2017

Share

NASA will probably delay the first two missions of its Orion deep-space capsule, being developed to send astronauts beyond earth’s orbit and eventually to Mars, the US space agency said.

A report by NASA’s Office of Inspector General cited technical as well as budget challenges.

The first launch of the Orion spacecraft atop the planned Space Launch System, or SLS—set to become the world’s most powerful rocket when it flies—is currently scheduled for early November 2018 with no crew.

A second mission carrying astronauts is envisioned for August 2021 at the earliest.

However, “NASA’s initial exploration missions on its Journey to Mars—EM-1 and EM-2—face multiple cost and technical challenges that likely will affect their planned launch dates,” the report said of the conclusions from a nine-month audit.

It cites delays in the development of the Orion service module, provided by the European Space Agency (ESA), as well as technical risks from changes in the design of the capsule’s heat shield.

The audit also reported delays in the development of software for the SLS, Orion and ground systems at the Kennedy Space Center in Florida.

“We are concerned NASA will not be able to resolve all necessary software validation and verification efforts in time to meet a November 2018 launch date for EM-1,” the report said.

The total cost for the SLS, Orion and ground systems development programs is expected to reach some $23 billion by the end of fiscal year 2018.

Manned exploration of Mars is expected to exceed $33 billion by 2033.

The White House in February asked the space agency to conduct a feasibility study of the cost, safety, and technical constraints of adding astronauts to the first Orion mission in late 2018.

The report also questions the feasibility of NASA’s plans to launch a manned mission to Mars in the late 2030s or early 2040s. The agency has not provided target mission dates for a manned orbit of Mars or landings on the planet’s surface or nearby moon, it said.

To achieve its goal of sending humans to the vicinity of Mars in the 2030s, NASA must carry out “significant development work on key systems such as a deep space habitat, in-space transportation, and Mars landing and ascent vehicles” in the 2020s, the report added.

“The Agency will need to make these and many other decisions in the next 5 years or so for that to happen.”


Filed Under: Aerospace + defense

 

Related Articles Read More >

Ontic acquires Servotek and Westcon product lines from Marsh Bellofram
Flexible rotary shafts support thrust reverser on 150 LEAP 1-A turbofan engines
Drone-mounted inspection breaks barriers for F-35
TriStar, a misunderstood failure of design

DESIGN GUIDE LIBRARY

“motion

Enews Sign Up

Motion Control Classroom

Design World Digital Edition

cover

Browse the most current issue of Design World and back issues in an easy to use high quality format. Clip, share and download with the leading design engineering magazine today.

EDABoard the Forum for Electronics

Top global problem solving EE forum covering Microcontrollers, DSP, Networking, Analog and Digital Design, RF, Power Electronics, PCB Routing and much more

EDABoard: Forum for electronics

Sponsored Content

  • Global supply needs drive increased manufacturing footprint development
  • How to Increase Rotational Capacity for a Retaining Ring
  • Cordis high resolution electronic proportional pressure controls
  • WAGO’s custom designed interface wiring system making industrial applications easier
  • 10 Reasons to Specify Valve Manifolds
  • Case study: How a 3D-printed tool saved thousands of hours and dollars

Design World Podcasts

May 17, 2022
Another view on additive and the aerospace industry
See More >
Engineering Exchange

The Engineering Exchange is a global educational networking community for engineers.

Connect, share, and learn today »

Design World
  • Advertising
  • About us
  • Contact
  • Manage your Design World Subscription
  • Subscribe
  • Design World Digital Network
  • Engineering White Papers
  • LEAP AWARDS

Copyright © 2022 WTWH Media LLC. All Rights Reserved. The material on this site may not be reproduced, distributed, transmitted, cached or otherwise used, except with the prior written permission of WTWH Media
Privacy Policy | Advertising | About Us

Search Design World

  • Home
  • Technologies
    • 3D CAD
    • Electronics • electrical
    • Fastening & Joining
    • Factory automation
    • Linear Motion
    • Motion Control
    • Test & Measurement
    • Sensors
    • Fluid power
  • Learn
    • Ebooks / Tech Tips
    • Engineering Week
    • Future of Design Engineering
    • MC² Motion Control Classrooms
    • Podcasts
    • Videos
    • Webinars
  • LEAP AWARDS
  • Leadership
    • 2022 Voting
    • 2021 Winners
  • Design Guide Library
  • Resources
    • 3D Cad Models
      • PARTsolutions
      • TraceParts
    • Digital Issues
      • Design World
      • EE World
    • Women in Engineering
  • Supplier Listings