Design World

  • Home
  • Technologies
    • ELECTRONICS • ELECTRICAL
    • Fastening • joining
    • FLUID POWER
    • LINEAR MOTION
    • MOTION CONTROL
    • SENSORS
    • TEST & MEASUREMENT
    • Factory automation
    • Warehouse automation
    • DIGITAL TRANSFORMATION
  • Learn
    • Tech Toolboxes
    • Learning center
    • eBooks • Tech Tips
    • Podcasts
    • Videos
    • Webinars • general engineering
    • Webinars • Automated warehousing
    • Voices
  • LEAP Awards
  • 2025 Leadership
    • 2024 Winners
    • 2023 Winners
    • 2022 Winners
    • 2021 Winners
  • Design Guides
  • Resources
    • Subscribe
    • 3D Cad Models
      • PARTsolutions
      • TraceParts
    • Digital Issues
      • Design World
      • EE World
    • Engineering diversity
    • Trends
  • Supplier Listings
  • Advertise
  • Subscribe

NASA Progressing Toward First Launch of Orion Spacecraft

By NASA | December 17, 2012

Recent engineering advances by NASA and its industry partners across the country show important progress toward Exploration Flight Test-1 (EFT-1), the next step to launching humans to deep space. The uncrewed EFT-1 mission, launching from NASA’s Kennedy Space Center in Florida in 2014, will test the re-entry performance of the agency’s Orion capsule, the most advanced spacecraft ever designed, which will carry astronauts farther into space than ever before.

“These recent milestones are laying the foundation for our first flight test of Orion in 2014,” said Dan Dumbacher, deputy associate administrator for exploration systems development at NASA Headquarters in Washington. “The work being done to prepare for the flight test is really a nationwide effort and we have a dedicated team committed to our goal of expanding the frontier of space.”

A tool that will allow the titanium skeleton of the Orion heat shield to be bolted to its carbon fiber skin is at the Denver facility of the spacecraft’s prime contractor Lockheed Martin. This will enable workers to begin assembling the two pieces of the heat shield. Almost 3,000 bolts are needed to hold the skeleton to the skin. A special stand was built to align the skin on the skeleton as holes for the bolts are drilled. Work to bolt the skeleton to the skin will be completed in January. The heat shield then will be shipped to Textron Defense Systems near Boston where the final layer, an ablative material very similar to that used on the Apollo spacecraft, will be added. The completed heat shield is scheduled to be ready for installation onto the Orion crew module at Kennedy next summer.

To test the heat shield during EFT-1’s re-entry, Orion will travel more than 3,600 miles above Earth’s surface, 15 times farther than the International Space Station’s orbital position. This is farther than any spacecraft designed to carry humans has gone in more than 40 years. Orion will return home at a speed almost 5,000 mph faster than any current human spacecraft.

This week, engineers at NASA’s Marshall Space Flight Center in Huntsville, Ala., received materials to begin manufacturing the adapter that will connect the Orion capsule to a United Launch Alliance Delta IV heavy-lift rocket for EFT-1. Two forward and two aft rings will be welded to barrel panels to form two adapters. This adapter design will be tested during EFT-1 for use during the first launch of NASA’s next heavy-lift rocket, the Space Launch System (SLS), in 2017. SLS will launch NASA’s Orion spacecraft and other payloads beyond low Earth orbit, providing an entirely new capability for human exploration.

Data from the adapter on the flight test will provide Marshall engineers with invaluable experience developing hardware early in the design process. Designing the adapter once for multiple flights also provides a cost savings.

Of the two adapters welded at Marshall, one will attach Orion to the Delta IV heavy-lift rocket used for EFT-1. The other adapter will be a structural test article to gain knowledge on the design.

NASA’s Ground Systems Development and Operations (GSDO) Program also has passed a major agency review that lays the groundwork at Kennedy to support future Orion and SLS launches. The GSDO Program completed a combined system requirements review and system definition review, in which an independent board of technical experts from across NASA evaluated the program’s infrastructure specifications, budget and schedule. The board confirmed GSDO is ready to move from concept development to preliminary design. The combination of the two assessments represents a fundamentally different way of conducting NASA program reviews. The team is streamlining processes to provide the nation with a safe, affordable and sustainable launch facility.

The GSDO program last week also led the third Stationary Recovery Test Working Group session in Norfolk, Va. The team presented to the U.S. Navy detachment that will recover the capsule during EFT-1 a complete list of tasks required to accomplish stationary recovery test objectives. The working group outlined the plan for roles and responsibilities to accomplish required test procedures. Included in these presentations were the commanding officer of the USS Mesa Verde and the fleet forces command director of operations, who both expressed complete support for the test.

You Might Also Like


Filed Under: Aerospace + defense

 

LEARNING CENTER

Design World Learning Center
“dw
EXPAND YOUR KNOWLEDGE AND STAY CONNECTED
Get the latest info on technologies, tools and strategies for Design Engineering Professionals.
Motor University

Design World Digital Edition

cover

Browse the most current issue of Design World and back issues in an easy to use high quality format. Clip, share and download with the leading design engineering magazine today.

EDABoard the Forum for Electronics

Top global problem solving EE forum covering Microcontrollers, DSP, Networking, Analog and Digital Design, RF, Power Electronics, PCB Routing and much more

EDABoard: Forum for electronics

Sponsored Content

  • Sustainability, Innovation and Safety, Central to Our Approach
  • Why off-highway is the sweet spot for AC electrification technology
  • Looking to 2025: Past Success Guides Future Achievements
  • North American Companies Seek Stronger Ties with Italian OEMs
  • Adapt and Evolve
  • Sustainable Practices for a Sustainable World
View More >>
Engineering Exchange

The Engineering Exchange is a global educational networking community for engineers.

Connect, share, and learn today »

Design World
  • About us
  • Contact
  • Manage your Design World Subscription
  • Subscribe
  • Design World Digital Network
  • Control Engineering
  • Consulting-Specifying Engineer
  • Plant Engineering
  • Engineering White Papers
  • Leap Awards

Copyright © 2025 WTWH Media LLC. All Rights Reserved. The material on this site may not be reproduced, distributed, transmitted, cached or otherwise used, except with the prior written permission of WTWH Media
Privacy Policy | Advertising | About Us

Search Design World

  • Home
  • Technologies
    • ELECTRONICS • ELECTRICAL
    • Fastening • joining
    • FLUID POWER
    • LINEAR MOTION
    • MOTION CONTROL
    • SENSORS
    • TEST & MEASUREMENT
    • Factory automation
    • Warehouse automation
    • DIGITAL TRANSFORMATION
  • Learn
    • Tech Toolboxes
    • Learning center
    • eBooks • Tech Tips
    • Podcasts
    • Videos
    • Webinars • general engineering
    • Webinars • Automated warehousing
    • Voices
  • LEAP Awards
  • 2025 Leadership
    • 2024 Winners
    • 2023 Winners
    • 2022 Winners
    • 2021 Winners
  • Design Guides
  • Resources
    • Subscribe
    • 3D Cad Models
      • PARTsolutions
      • TraceParts
    • Digital Issues
      • Design World
      • EE World
    • Engineering diversity
    • Trends
  • Supplier Listings
  • Advertise
  • Subscribe
We use cookies to personalize content and ads, to provide social media features, and to analyze our traffic. We share information about your use of our site with our social media, advertising, and analytics partners who may combine it with other information you’ve provided to them or that they’ve collected from your use of their services. You consent to our cookies if you continue to use this website.OkNoRead more