Design World

  • Home
  • Technologies
    • ELECTRONICS • ELECTRICAL
    • Fastening • joining
    • FLUID POWER
    • LINEAR MOTION
    • MOTION CONTROL
    • SENSORS
    • TEST & MEASUREMENT
    • Factory automation
    • Warehouse automation
    • DIGITAL TRANSFORMATION
  • Learn
    • Tech Toolboxes
    • Learning center
    • eBooks • Tech Tips
    • Podcasts
    • Videos
    • Webinars • general engineering
    • Webinars • Automated warehousing
    • Voices
  • LEAP Awards
  • 2026 Leadership
    • 2025 Winners
    • 2024 Winners
    • 2023 Winners
    • 2022 Winners
    • 2021 Winners
  • Design Guides
  • Resources
    • 3D Cad Models
      • PARTsolutions
      • TraceParts
    • Digital Issues
      • Design World
      • EE World
    • Educational Assets
    • Engineering diversity
    • On the Floor
    • Reports
    • Trends
  • Supplier Listings
  • Advertise
  • SUBSCRIBE
    • MAGAZINE
    • NEWSLETTER

Officials to Update Repair Work on Bay Bridge

By The Associated Press | May 29, 2013

The new eastern span of the San Francisco-Oakland Bay Bridge has another bolt problem — this one involving the bicycle path, a newspaper reported Wednesday.

Numerous bolts used to anchor the railing along the path have failed, forcing the California Department of Transportation to make plans to replace hundreds of the steel parts, The San Francisco Chronicle reported (http://bit.ly/18yvtMW ).

The news comes as officials overseeing construction of the new span are scheduled to update the public later Wednesday about repairs to 32 seismic safety rods that broke after being tightened in March.

The failure of those rods, which attach the bridge deck to earthquake shock absorbers called “shear keys,” has put the bridge’s planned Labor Day opening date in jeopardy.

State transportation officials are not expected to say definitively Wednesday whether the span will open as scheduled on Labor Day weekend.

Instead, they are scheduled to describe progress in installing a new steel saddle that will go over the base of the shear keys to hold them in place in lieu of the broken rods.

The problem with the bike path is not nearly as significant, the Chronicle reported. But it adds to concerns about the bridge project, which already is years late in opening and billions of dollars over budget.

The new bridge is replacing a span damaged during the 1989 Loma Prieta earthquake.

The problem with the bolts on the bike path appears to be the result of improper welding, the Chronicle reported. Crews who built the path’s railing welded the bolts firmly in their slots rather than leaving a small amount of room to accommodate a natural expansion of the path that happens in hot weather.

As a result, many of the bolts have been sheared off along the 1.2-mile bike path.

Caltrans officials say they have known about the bike path problem since last year. Every bolt holding the railing will have to be inspected, and many likely will have to be replaced, Caltrans spokesman Will Shuck said.

“It will be 100 percent fixed before they open that bicycle path,” he told the Chronicle.

You might also like


Filed Under: Industrial automation

 

LEARNING CENTER

Design World Learning Center
“dw
EXPAND YOUR KNOWLEDGE AND STAY CONNECTED
Get the latest info on technologies, tools and strategies for Design Engineering Professionals.
Motor University

Design World Digital Edition

cover

Browse the most current issue of Design World and back issues in an easy to use high quality format. Clip, share and download with the leading design engineering magazine today.

EDABoard the Forum for Electronics

Top global problem solving EE forum covering Microcontrollers, DSP, Networking, Analog and Digital Design, RF, Power Electronics, PCB Routing and much more

EDABoard: Forum for electronics

Sponsored Content

  • Two Japanese heavyweights collaborate for physical AI
  • Overcoming Modern Motion Control Challenges with Enidine’s Energy Absorption and Vibration Isolation Solutions
  • Hyundai and Boston Dynamics bet big on AI robot training for manufacturing
  • From Component Search to Component Confidence
  • Packaging Without Pneumatics: A Smarter Approach to Flexible Automation
  • How Apple Rubber’s Rapid Prototyping Kept Whale Research Afloat
View More >>
Design World
  • About us
  • Contact
  • Manage your Design World Subscription
  • Subscribe
  • Design World Digital Network
  • Control Engineering
  • Consulting-Specifying Engineer
  • Plant Engineering
  • Engineering White Papers
  • Leap Awards

Copyright © 2026 Arrowfly LLC. All Rights Reserved. The material on this site may not be reproduced, distributed, transmitted, cached or otherwise used, except with the prior written permission of Arrowfly
Privacy Policy | Advertising | About Us

Search Design World

  • Home
  • Technologies
    • ELECTRONICS • ELECTRICAL
    • Fastening • joining
    • FLUID POWER
    • LINEAR MOTION
    • MOTION CONTROL
    • SENSORS
    • TEST & MEASUREMENT
    • Factory automation
    • Warehouse automation
    • DIGITAL TRANSFORMATION
  • Learn
    • Tech Toolboxes
    • Learning center
    • eBooks • Tech Tips
    • Podcasts
    • Videos
    • Webinars • general engineering
    • Webinars • Automated warehousing
    • Voices
  • LEAP Awards
  • 2026 Leadership
    • 2025 Winners
    • 2024 Winners
    • 2023 Winners
    • 2022 Winners
    • 2021 Winners
  • Design Guides
  • Resources
    • 3D Cad Models
      • PARTsolutions
      • TraceParts
    • Digital Issues
      • Design World
      • EE World
    • Educational Assets
    • Engineering diversity
    • On the Floor
    • Reports
    • Trends
  • Supplier Listings
  • Advertise
  • SUBSCRIBE
    • MAGAZINE
    • NEWSLETTER