Design World

  • Home
  • Technologies
    • 3D CAD
    • Electronics • electrical
    • Fastening & Joining
    • Factory automation
    • Linear Motion
    • Motion Control
    • Test & Measurement
    • Sensors
    • Fluid power
  • Learn
    • Ebooks / Tech Tips
    • Engineering Week
    • Future of Design Engineering
    • MC² Motion Control Classrooms
    • Podcasts
    • Videos
    • Webinars
  • LEAP AWARDS
  • Leadership
    • 2022 Voting
    • 2021 Winners
  • Design Guide Library
  • Resources
    • 3D Cad Models
      • PARTsolutions
      • TraceParts
    • Digital Issues
      • Design World
      • EE World
    • Women in Engineering
  • Supplier Listings

Orion Teamwork Pays Off

By NASA | January 17, 2013

Share

Using its experienced workforce and state-of-the-art facilities, NASA’s Kennedy Space Center in Florida is working with private companies to ensure the future of U.S. space exploration stays on course. By bringing contracted work to Kennedy, NASA is providing a means to expedite Orion work from months to build and ship across the nation, to mere days. See all of the photos here.

NASA employees and Lockheed Martin contractors are working side by side in a revamped area of Kennedy’s Operations and Checkout Building. Their goal is to prepare NASA’s Orion spacecraft for its first launch, Exploration Flight Test-1, or EFT-1, in 2014. Orion is designed to take American astronauts farther into space than ever before.

Colocating contractors on-site provides the advantage of having center personnel and facilities readily available. Because of this cooperative effort, the Orion team is achieving its scheduled milestones for assembly and checkout of the spacecraft ahead of schedule.

“This new and unique working relationship, in essence having a Lockheed Martin factory within a NASA facility, has allowed us to leverage Lockheed’s strength in building spacecraft and the strength of our Kennedy workforce in providing world-class services and facilities,” said Scott Wilson, manager of production operations for the Orion Program, and the offline processing and infrastructure development for the Ground Systems Development and Operations Program.

In preparation for EFT-1, a number of processing milestones have been set to make sure the spacecraft is ready for launch. Engineers and technicians from a number of different areas at Kennedy are lending their help by providing solutions to issues that arise during the on-site assembly and preparation.

Upcoming milestones will include testing the structure of the crew module, powering up the vehicle for the first time, completing the assembly and subsystem installations for the crew module, service module and launch abort system, and finally, joining the crew and service modules together.

“We are extremely proud of the exceptional effort the team has demonstrated in preparing the Orion crew module for a recent critical pressurization test. This test was a key milestone in our march toward orbital flight in 2014,” Wilson said.

The materials and processing division possesses numerous capabilities that provide unique solutions to unusual or urgent problems that arise during spacecraft preparation. One example comes from the Space Shuttle Program.

“One of the unique capabilities here at Kennedy is the ability to fabricate, install and repair thermal tiles,” said Terri Holbert, project lead engineer for Assembly, Integration and Production. “The team that performed this work for the space shuttle is now executing the tile build for Orion.”

Other areas that have contributed to Orion’s preparation are labs that offered dimensional analysis of hardware, materials testing and evaluation, and chemical analysis; a prototype shop that provided mechanical design, fabrication and rapid prototyping; and the Launch Equipment Test Facility that executed a pyrotechnics test on the tiles.

In the end, the ultimate goal is Orion’s uncrewed flight test aboard a Delta IV Heavy rocket. The flight will take the spacecraft on a two-orbit journey, reaching an altitude of about 3,600 miles above the Earth’s surface — more than 15 times farther than the International Space Station’s orbital position — and sending it farther than any human-rated spacecraft has gone since the Apollo program.

For more information visit www.nasa.gov.


Filed Under: Aerospace + defense

 

Related Articles Read More >

Ontic acquires Servotek and Westcon product lines from Marsh Bellofram
Flexible rotary shafts support thrust reverser on 150 LEAP 1-A turbofan engines
Drone-mounted inspection breaks barriers for F-35
TriStar, a misunderstood failure of design

DESIGN GUIDE LIBRARY

“motion

Enews Sign Up

Motion Control Classroom

Design World Digital Edition

cover

Browse the most current issue of Design World and back issues in an easy to use high quality format. Clip, share and download with the leading design engineering magazine today.

EDABoard the Forum for Electronics

Top global problem solving EE forum covering Microcontrollers, DSP, Networking, Analog and Digital Design, RF, Power Electronics, PCB Routing and much more

EDABoard: Forum for electronics

Sponsored Content

  • Global supply needs drive increased manufacturing footprint development
  • How to Increase Rotational Capacity for a Retaining Ring
  • Cordis high resolution electronic proportional pressure controls
  • WAGO’s custom designed interface wiring system making industrial applications easier
  • 10 Reasons to Specify Valve Manifolds
  • Case study: How a 3D-printed tool saved thousands of hours and dollars

Design World Podcasts

May 17, 2022
Another view on additive and the aerospace industry
See More >
Engineering Exchange

The Engineering Exchange is a global educational networking community for engineers.

Connect, share, and learn today »

Design World
  • Advertising
  • About us
  • Contact
  • Manage your Design World Subscription
  • Subscribe
  • Design World Digital Network
  • Engineering White Papers
  • LEAP AWARDS

Copyright © 2022 WTWH Media LLC. All Rights Reserved. The material on this site may not be reproduced, distributed, transmitted, cached or otherwise used, except with the prior written permission of WTWH Media
Privacy Policy | Advertising | About Us

Search Design World

  • Home
  • Technologies
    • 3D CAD
    • Electronics • electrical
    • Fastening & Joining
    • Factory automation
    • Linear Motion
    • Motion Control
    • Test & Measurement
    • Sensors
    • Fluid power
  • Learn
    • Ebooks / Tech Tips
    • Engineering Week
    • Future of Design Engineering
    • MC² Motion Control Classrooms
    • Podcasts
    • Videos
    • Webinars
  • LEAP AWARDS
  • Leadership
    • 2022 Voting
    • 2021 Winners
  • Design Guide Library
  • Resources
    • 3D Cad Models
      • PARTsolutions
      • TraceParts
    • Digital Issues
      • Design World
      • EE World
    • Women in Engineering
  • Supplier Listings