Design World

  • Home
  • Technologies
    • ELECTRONICS • ELECTRICAL
    • Fastening • joining
    • FLUID POWER
    • LINEAR MOTION
    • MOTION CONTROL
    • SENSORS
    • TEST & MEASUREMENT
    • Factory automation
    • Warehouse automation
    • DIGITAL TRANSFORMATION
  • Learn
    • Tech Toolboxes
    • Learning center
    • eBooks • Tech Tips
    • Podcasts
    • Videos
    • Webinars • general engineering
    • Webinars • Automated warehousing
    • Voices
  • LEAP Awards
  • 2025 Leadership
    • 2024 Winners
    • 2023 Winners
    • 2022 Winners
    • 2021 Winners
  • Design Guides
  • Resources
    • Subscribe
    • 3D Cad Models
      • PARTsolutions
      • TraceParts
    • Digital Issues
      • Design World
      • EE World
    • Engineering diversity
    • Trends
  • Supplier Listings
  • Advertise
  • Subscribe

Orion Teamwork Pays Off

By NASA | January 17, 2013

Using its experienced workforce and state-of-the-art facilities, NASA’s Kennedy Space Center in Florida is working with private companies to ensure the future of U.S. space exploration stays on course. By bringing contracted work to Kennedy, NASA is providing a means to expedite Orion work from months to build and ship across the nation, to mere days. See all of the photos here.

NASA employees and Lockheed Martin contractors are working side by side in a revamped area of Kennedy’s Operations and Checkout Building. Their goal is to prepare NASA’s Orion spacecraft for its first launch, Exploration Flight Test-1, or EFT-1, in 2014. Orion is designed to take American astronauts farther into space than ever before.

Colocating contractors on-site provides the advantage of having center personnel and facilities readily available. Because of this cooperative effort, the Orion team is achieving its scheduled milestones for assembly and checkout of the spacecraft ahead of schedule.

“This new and unique working relationship, in essence having a Lockheed Martin factory within a NASA facility, has allowed us to leverage Lockheed’s strength in building spacecraft and the strength of our Kennedy workforce in providing world-class services and facilities,” said Scott Wilson, manager of production operations for the Orion Program, and the offline processing and infrastructure development for the Ground Systems Development and Operations Program.

In preparation for EFT-1, a number of processing milestones have been set to make sure the spacecraft is ready for launch. Engineers and technicians from a number of different areas at Kennedy are lending their help by providing solutions to issues that arise during the on-site assembly and preparation.

Upcoming milestones will include testing the structure of the crew module, powering up the vehicle for the first time, completing the assembly and subsystem installations for the crew module, service module and launch abort system, and finally, joining the crew and service modules together.

“We are extremely proud of the exceptional effort the team has demonstrated in preparing the Orion crew module for a recent critical pressurization test. This test was a key milestone in our march toward orbital flight in 2014,” Wilson said.

The materials and processing division possesses numerous capabilities that provide unique solutions to unusual or urgent problems that arise during spacecraft preparation. One example comes from the Space Shuttle Program.

“One of the unique capabilities here at Kennedy is the ability to fabricate, install and repair thermal tiles,” said Terri Holbert, project lead engineer for Assembly, Integration and Production. “The team that performed this work for the space shuttle is now executing the tile build for Orion.”

Other areas that have contributed to Orion’s preparation are labs that offered dimensional analysis of hardware, materials testing and evaluation, and chemical analysis; a prototype shop that provided mechanical design, fabrication and rapid prototyping; and the Launch Equipment Test Facility that executed a pyrotechnics test on the tiles.

In the end, the ultimate goal is Orion’s uncrewed flight test aboard a Delta IV Heavy rocket. The flight will take the spacecraft on a two-orbit journey, reaching an altitude of about 3,600 miles above the Earth’s surface — more than 15 times farther than the International Space Station’s orbital position — and sending it farther than any human-rated spacecraft has gone since the Apollo program.

For more information visit www.nasa.gov.

You Might Also Like


Filed Under: Aerospace + defense

 

LEARNING CENTER

Design World Learning Center
“dw
EXPAND YOUR KNOWLEDGE AND STAY CONNECTED
Get the latest info on technologies, tools and strategies for Design Engineering Professionals.
Motor University

Design World Digital Edition

cover

Browse the most current issue of Design World and back issues in an easy to use high quality format. Clip, share and download with the leading design engineering magazine today.

EDABoard the Forum for Electronics

Top global problem solving EE forum covering Microcontrollers, DSP, Networking, Analog and Digital Design, RF, Power Electronics, PCB Routing and much more

EDABoard: Forum for electronics

Sponsored Content

  • Sustainability, Innovation and Safety, Central to Our Approach
  • Why off-highway is the sweet spot for AC electrification technology
  • Looking to 2025: Past Success Guides Future Achievements
  • North American Companies Seek Stronger Ties with Italian OEMs
  • Adapt and Evolve
  • Sustainable Practices for a Sustainable World
View More >>
Engineering Exchange

The Engineering Exchange is a global educational networking community for engineers.

Connect, share, and learn today »

Design World
  • About us
  • Contact
  • Manage your Design World Subscription
  • Subscribe
  • Design World Digital Network
  • Control Engineering
  • Consulting-Specifying Engineer
  • Plant Engineering
  • Engineering White Papers
  • Leap Awards

Copyright © 2025 WTWH Media LLC. All Rights Reserved. The material on this site may not be reproduced, distributed, transmitted, cached or otherwise used, except with the prior written permission of WTWH Media
Privacy Policy | Advertising | About Us

Search Design World

  • Home
  • Technologies
    • ELECTRONICS • ELECTRICAL
    • Fastening • joining
    • FLUID POWER
    • LINEAR MOTION
    • MOTION CONTROL
    • SENSORS
    • TEST & MEASUREMENT
    • Factory automation
    • Warehouse automation
    • DIGITAL TRANSFORMATION
  • Learn
    • Tech Toolboxes
    • Learning center
    • eBooks • Tech Tips
    • Podcasts
    • Videos
    • Webinars • general engineering
    • Webinars • Automated warehousing
    • Voices
  • LEAP Awards
  • 2025 Leadership
    • 2024 Winners
    • 2023 Winners
    • 2022 Winners
    • 2021 Winners
  • Design Guides
  • Resources
    • Subscribe
    • 3D Cad Models
      • PARTsolutions
      • TraceParts
    • Digital Issues
      • Design World
      • EE World
    • Engineering diversity
    • Trends
  • Supplier Listings
  • Advertise
  • Subscribe
We use cookies to personalize content and ads, to provide social media features, and to analyze our traffic. We share information about your use of our site with our social media, advertising, and analytics partners who may combine it with other information you’ve provided to them or that they’ve collected from your use of their services. You consent to our cookies if you continue to use this website.OkNoRead more