Design World

  • Home
  • Technologies
    • 3D CAD
    • Electronics • electrical
    • Fastening & Joining
    • Factory automation
    • Linear Motion
    • Motion Control
    • Test & Measurement
    • Sensors
    • Fluid power
  • Learn
    • Ebooks / Tech Tips
    • Engineering Week
    • Future of Design Engineering
    • MC² Motion Control Classrooms
    • Podcasts
    • Videos
    • Webinars
  • LEAP AWARDS
  • Leadership
    • 2022 Voting
    • 2021 Winners
  • Design Guide Library
  • Resources
    • 3D Cad Models
      • PARTsolutions
      • TraceParts
    • Digital Issues
      • Design World
      • EE World
    • Women in Engineering
  • Supplier Listings

Special Solar Array Ballasted Footings Used for the Largest Solar Energy System in Northampton

By atesmeh | July 12, 2011

Share

Oldcastle Precast delivered 176 custom designed precast footings to Renewable Sales, LLC., a Massachusetts – based leading wholesale distributor of photovoltaic and solar thermal energy products to complete the construction of the largest photovoltaic solar system to date, in the city of Northampton, at the Smith Vocational and Agricultural High School.

The 108-kilowatt solar array, built on the school’s old tennis courts, is composed of eighty-eight solar arrays which incorporate approximately 500-solar panels that will reduce energy use by 20 percent annually after its completion in September. The system’s panels can be tilted at different angles to capture the most sunlight, depending on the time of year. Renewable Sales, LLC contracted Oldcastle Precast, Inc.-Rehoboth to custom manufacture the at-grade precast ballasted footings for their solar arrays.

Renewable Sales, LLC needed special footings to ground mount their solar arrays due to the ground conditions at the site. Oldcastle Precast, Inc. provided their precast expertise and custom designed an at-grade precast ballasted footing for Renewable Sales’ GEMINI PV Ground Mount System. The ballasted footings are independent, precast concrete footings for ground mounted solar electrical systems. The GEMINI ballasted footings are engineered to work in virtually any location, environment or application conditions, including variations in wind speed, tilt angle, support and racking configuration, solar module size, weight, local design codes and project requirements.

This type of precast solar array foundation is designed for use in the most demanding solar panel applications where the panels need to be secured in unstable, environmentally sensitive, or impenetrable ground conditions or where a non- penetrating solution is required. These footings are also designed for relocation and reuse.

Due to the modular construction of the foundations and racking, the entire mounting system was constructed in two weeks, which is very impressive for an installation this size.

The roughly $500,000 project at Smith Vocational is being funded from two sources – 55 percent from a low-interest Clean Renewable Energy Bond and 45 percent from a state Green Communities grant. Earlier this year, the city qualified as a “Green Community,” which enabled it to apply for grants to help with energy-efficiency and renewable-energy investment. 

For more information please visit, www.oldcastleprecast.com. 


Filed Under: Industrial automation

 

Related Articles Read More >

Festo and the power of worker upskilling at the Oracle Industry Lab
Five ways to drive ROI from personnel and cobot investments
Safety Air Guns use engineered air nozzles for high performance
EXAIR’s new no drip siphon fed spray nozzle coats, cools and cleans

DESIGN GUIDE LIBRARY

“motion

Enews Sign Up

Motion Control Classroom

Design World Digital Edition

cover

Browse the most current issue of Design World and back issues in an easy to use high quality format. Clip, share and download with the leading design engineering magazine today.

EDABoard the Forum for Electronics

Top global problem solving EE forum covering Microcontrollers, DSP, Networking, Analog and Digital Design, RF, Power Electronics, PCB Routing and much more

EDABoard: Forum for electronics

Sponsored Content

  • Global supply needs drive increased manufacturing footprint development
  • How to Increase Rotational Capacity for a Retaining Ring
  • Cordis high resolution electronic proportional pressure controls
  • WAGO’s custom designed interface wiring system making industrial applications easier
  • 10 Reasons to Specify Valve Manifolds
  • Case study: How a 3D-printed tool saved thousands of hours and dollars

Design World Podcasts

May 17, 2022
Another view on additive and the aerospace industry
See More >
Engineering Exchange

The Engineering Exchange is a global educational networking community for engineers.

Connect, share, and learn today »

Design World
  • Advertising
  • About us
  • Contact
  • Manage your Design World Subscription
  • Subscribe
  • Design World Digital Network
  • Engineering White Papers
  • LEAP AWARDS

Copyright © 2022 WTWH Media LLC. All Rights Reserved. The material on this site may not be reproduced, distributed, transmitted, cached or otherwise used, except with the prior written permission of WTWH Media
Privacy Policy | Advertising | About Us

Search Design World

  • Home
  • Technologies
    • 3D CAD
    • Electronics • electrical
    • Fastening & Joining
    • Factory automation
    • Linear Motion
    • Motion Control
    • Test & Measurement
    • Sensors
    • Fluid power
  • Learn
    • Ebooks / Tech Tips
    • Engineering Week
    • Future of Design Engineering
    • MC² Motion Control Classrooms
    • Podcasts
    • Videos
    • Webinars
  • LEAP AWARDS
  • Leadership
    • 2022 Voting
    • 2021 Winners
  • Design Guide Library
  • Resources
    • 3D Cad Models
      • PARTsolutions
      • TraceParts
    • Digital Issues
      • Design World
      • EE World
    • Women in Engineering
  • Supplier Listings