Design World

  • Home
  • Technologies
    • 3D CAD
    • Electronics • electrical
    • Fastening & Joining
    • Factory automation
    • Linear Motion
    • Motion Control
    • Test & Measurement
    • Sensors
    • Fluid power
  • Learn
    • Ebooks / Tech Tips
    • Engineering Week
    • Future of Design Engineering
    • MC² Motion Control Classrooms
    • Podcasts
    • Videos
    • Webinars
  • LEAP AWARDS
  • Leadership
    • 2022 Voting
    • 2021 Winners
  • Design Guide Library
  • Resources
    • 3D Cad Models
      • PARTsolutions
      • TraceParts
    • Digital Issues
      • Design World
      • EE World
    • Women in Engineering
  • Supplier Listings

Canada Regulatory Board Greenlights Trans Mountain Pipeline

By The Associated Press | May 20, 2016

Share

Canada’s energy regulator on Thursday recommended the approval of Kinder Morgan Canada’s plan to expand the Trans Mountain oil pipeline, subject to dozens of conditions.

Kinder Morgan wants to triple the capacity of its existing Trans Mountain pipeline, which carries diluted bitumen from oil sands near Edmonton to Burnaby, British Columbia for export. The US$5.9 billion (CA$6.8-billion) Trans Mountain pipeline expansion would bring capacity to 890,000 barrels a day.

The regulator’s positive recommendation has cleared a major hurdle for the project, with Prime Minister Justin Trudeau’s cabinet set to make a final decision by the end of the year.

But Kinder Morgan would have to address 157 environmental, safety and financial conditions, including holding $1.1 billion in liability coverage and detailing its plans to protect endangered species. The board said the project is the first to be required to detail plans for offsetting emissions.

There was fierce opposition to the project and the process throughout the energy board’s hearing, with the British Columbia government and cities of Vancouver and Burnaby opposing the expansion.

Environmental groups said they weren’t surprised by the decision.

“This is exactly what we expected from the National Energy Board, an industry-captured regulator that never met a pipeline it didn’t like or environmental impact it couldn’t ignore,” Larissa Stendie of the Sierra Club said in a statement.

But the board concluded the project presents significant benefits to Canada, including increased access to diverse markets for Canadian oil, thousands of construction jobs and hundreds of long-term jobs, development opportunities for indigenous and local communities and considerable government revenues.

Canada has the third largest reserves of oil after Saudi Arabia and Venezuela but 97 percent of its oil exports go to the United States and Canada is eager to diversify.

Kinder Morgan said in a statement it was “pleased” the board had recommended approval of the project.

Peter McCartney, a climate campaigner with the Wilderness Committee, said the project has no social license and will not be built.

“I shouldn’t be surprised, but this is an outrageous decision. The National Energy Board has ignored and wasted the time of countless communities, First Nations and individuals who have stood up to oppose this irresponsible pipeline proposal,” he said in a statement.


Filed Under: Infrastructure

 

Related Articles Read More >

Do Sensors Make Infrastructure Safer?
Crawling Robots and Flying Drones May Help Missouri’s Bridges
Viasat and Facebook Collaborate to Expand Internet Connectivity in Rural Mexico
Smartphone-Based System to Monitor America’s Crumbling Infrastructure

DESIGN GUIDE LIBRARY

“motion

Enews Sign Up

Motion Control Classroom

Design World Digital Edition

cover

Browse the most current issue of Design World and back issues in an easy to use high quality format. Clip, share and download with the leading design engineering magazine today.

EDABoard the Forum for Electronics

Top global problem solving EE forum covering Microcontrollers, DSP, Networking, Analog and Digital Design, RF, Power Electronics, PCB Routing and much more

EDABoard: Forum for electronics

Sponsored Content

  • Global supply needs drive increased manufacturing footprint development
  • How to Increase Rotational Capacity for a Retaining Ring
  • Cordis high resolution electronic proportional pressure controls
  • WAGO’s custom designed interface wiring system making industrial applications easier
  • 10 Reasons to Specify Valve Manifolds
  • Case study: How a 3D-printed tool saved thousands of hours and dollars

Design World Podcasts

May 17, 2022
Another view on additive and the aerospace industry
See More >
Engineering Exchange

The Engineering Exchange is a global educational networking community for engineers.

Connect, share, and learn today »

Design World
  • Advertising
  • About us
  • Contact
  • Manage your Design World Subscription
  • Subscribe
  • Design World Digital Network
  • Engineering White Papers
  • LEAP AWARDS

Copyright © 2022 WTWH Media LLC. All Rights Reserved. The material on this site may not be reproduced, distributed, transmitted, cached or otherwise used, except with the prior written permission of WTWH Media
Privacy Policy | Advertising | About Us

Search Design World

  • Home
  • Technologies
    • 3D CAD
    • Electronics • electrical
    • Fastening & Joining
    • Factory automation
    • Linear Motion
    • Motion Control
    • Test & Measurement
    • Sensors
    • Fluid power
  • Learn
    • Ebooks / Tech Tips
    • Engineering Week
    • Future of Design Engineering
    • MC² Motion Control Classrooms
    • Podcasts
    • Videos
    • Webinars
  • LEAP AWARDS
  • Leadership
    • 2022 Voting
    • 2021 Winners
  • Design Guide Library
  • Resources
    • 3D Cad Models
      • PARTsolutions
      • TraceParts
    • Digital Issues
      • Design World
      • EE World
    • Women in Engineering
  • Supplier Listings