Design World

  • Home
  • Technologies
    • ELECTRONICS • ELECTRICAL
    • Fastening • joining
    • FLUID POWER
    • LINEAR MOTION
    • MOTION CONTROL
    • SENSORS
    • TEST & MEASUREMENT
    • Factory automation
    • Warehouse automation
    • DIGITAL TRANSFORMATION
  • Learn
    • Tech Toolboxes
    • Learning center
    • eBooks • Tech Tips
    • Podcasts
    • Videos
    • Webinars • general engineering
    • Webinars • Automated warehousing
    • Voices
  • LEAP Awards
  • 2026 Leadership
    • 2025 Winners
    • 2024 Winners
    • 2023 Winners
    • 2022 Winners
    • 2021 Winners
  • Design Guides
  • Resources
    • 3D Cad Models
      • PARTsolutions
      • TraceParts
    • Digital Issues
      • Design World
      • EE World
    • Educational Assets
    • Engineering diversity
    • Reports
    • Trends
  • Supplier Listings
  • Advertise
  • SUBSCRIBE
    • MAGAZINE
    • NEWSLETTER

TransCanada Sues Obama Administration Over Keystone XL

By Andy Szal | January 8, 2016

TransCanada argues in a new court filing that President Obama exceeded his constitutional authority by rejecting the Keystone XL pipeline.

The Canadian energy giant filed a lawsuit in federal court in Houston that seeks to overturn the November decision denying the pipeline.

A second measure filed by TransCanada, meanwhile, alleged that the rejection violated the terms of the North American Free Trade Agreement and seeks more than $15 billion in damages.

The Keystone XL project, which was first proposed in 2008, sought to complete a massive pipeline network between Canadian oil reserves and Gulf Coast refineries.

The proposal, however, came to exemplify the general dispute in Washington between business interests and environmental advocates.

President Obama ultimately rejected the project over a State Department finding that it would not advance the national interest. But he also said that Keystone XL would “undercut” U.S. leadership on climate change ahead of a sweeping UN conference in Paris.

TransCanada, in the Houston lawsuit, countered that the president could not unilaterally reject the project, particularly if the decision “rests on foreigners’ mistaken objections.”

“Any power to prohibit such activities unquestionably would rest in the Congress, not the president acting without statutory authority,” the company’s attorneys wrote.

The NAFTA challenge, meanwhile, alleged that the November decision was a “symbolic gesture” rather than a decision based on the project’s merits.

The U.S. has never lost a NAFTA case, but TransCanada said that a careful evaluation showed “a clear violation of NAFTA in these circumstances.”

“Stated simply, the delay and the ultimate decision to deny the permit were politically-driven, directly contrary to the findings of the administration’s own studies, and not based on the merits of Keystone’s application,” the filing said.

You might also like


Filed Under: Infrastructure

 

LEARNING CENTER

Design World Learning Center
“dw
EXPAND YOUR KNOWLEDGE AND STAY CONNECTED
Get the latest info on technologies, tools and strategies for Design Engineering Professionals.
Motor University

Design World Digital Edition

cover

Browse the most current issue of Design World and back issues in an easy to use high quality format. Clip, share and download with the leading design engineering magazine today.

EDABoard the Forum for Electronics

Top global problem solving EE forum covering Microcontrollers, DSP, Networking, Analog and Digital Design, RF, Power Electronics, PCB Routing and much more

EDABoard: Forum for electronics

Sponsored Content

  • For the machines that don’t take days off. How Electrification Is Reshaping On- and Off-Road Machinery.
  • CASE STUDY: Inside ThredUp’s High-Tech Transformation of Its Four-Story Conveyor System
  • Performance Starts with Precision Cuts
  • eBook: Setting The Standard For Precise Alignment
  • How Concentric Maxi Torque Bushings Speed the Deployment of High-Precision Machines
  • Simplifying wiring inside industrial control cabinets
View More >>
Engineering Exchange

The Engineering Exchange is a global educational networking community for engineers.

Connect, share, and learn today »

Design World
  • About us
  • Contact
  • Manage your Design World Subscription
  • Subscribe
  • Design World Digital Network
  • Control Engineering
  • Consulting-Specifying Engineer
  • Plant Engineering
  • Engineering White Papers
  • Leap Awards

Copyright © 2026 WTWH Media LLC. All Rights Reserved. The material on this site may not be reproduced, distributed, transmitted, cached or otherwise used, except with the prior written permission of WTWH Media
Privacy Policy | Advertising | About Us

Search Design World

  • Home
  • Technologies
    • ELECTRONICS • ELECTRICAL
    • Fastening • joining
    • FLUID POWER
    • LINEAR MOTION
    • MOTION CONTROL
    • SENSORS
    • TEST & MEASUREMENT
    • Factory automation
    • Warehouse automation
    • DIGITAL TRANSFORMATION
  • Learn
    • Tech Toolboxes
    • Learning center
    • eBooks • Tech Tips
    • Podcasts
    • Videos
    • Webinars • general engineering
    • Webinars • Automated warehousing
    • Voices
  • LEAP Awards
  • 2026 Leadership
    • 2025 Winners
    • 2024 Winners
    • 2023 Winners
    • 2022 Winners
    • 2021 Winners
  • Design Guides
  • Resources
    • 3D Cad Models
      • PARTsolutions
      • TraceParts
    • Digital Issues
      • Design World
      • EE World
    • Educational Assets
    • Engineering diversity
    • Reports
    • Trends
  • Supplier Listings
  • Advertise
  • SUBSCRIBE
    • MAGAZINE
    • NEWSLETTER