Design World

  • Home
  • Technologies
    • ELECTRONICS • ELECTRICAL
    • Fastening • joining
    • FLUID POWER
    • LINEAR MOTION
    • MOTION CONTROL
    • SENSORS
    • TEST & MEASUREMENT
    • Factory automation
    • Warehouse automation
    • DIGITAL TRANSFORMATION
  • Learn
    • Tech Toolboxes
    • Learning center
    • eBooks • Tech Tips
    • Podcasts
    • Videos
    • Webinars • general engineering
    • Webinars • Automated warehousing
    • Voices
  • LEAP Awards
  • 2025 Leadership
    • 2024 Winners
    • 2023 Winners
    • 2022 Winners
    • 2021 Winners
  • Design Guides
  • Resources
    • Subscribe
    • 3D Cad Models
      • PARTsolutions
      • TraceParts
    • Digital Issues
      • Design World
      • EE World
    • Educational Assets
    • Engineering diversity
    • Trends
  • Supplier Listings
  • Advertise
  • Subscribe

NASA, Boeing Simulate Return from Low-Earth Orbit Commercial Crew Mission

By NASA | August 25, 2016

Hoisted about 30 feet in the air, a mockup of Boeing’s CST-100 Starliner spacecraft awaits its encounter with a pad full of dirt.

“Three, two, one” projects over the loud speaker just before the spacecraft is released and makes a loud thud when meeting the dirt. Six attached airbags absorb much of the landing impact and stabilize the spacecraft.

Boeing and NASA engineers at NASA’s Langley Research Center in Hampton, Virginia, kicked off an initial series of six land landing qualification tests to simulate what the actual spacecraft and crew may experience after returning to Earth from the International Space Station.

The spacecraft is being developed in collaboration with NASA’s Commercial Crew Program.

According to Boeing test engineer Preston Ferguson, the team at Langley is simulating the worst possible landing velocities and angles the spacecraft could experience while making its landing in the American Southwest.

“We have to verify the capability of landing at enveloping capsule and soil conditions to make sure that the vehicle will be stable and that the crew will be safe under expected parachute landing conditions,” Ferguson explained.

Before beginning the land test series, the team wrapped up the last of 14 abort water landing scenarios at Langley’s 20-foot-deep Hydro Impact Basin. Each scenario simulated an unlikely emergency during launch or return from the station. It also helped engineers understand and test the airbag and up-righting systems that protect astronauts. 

After collecting, analyzing and implementing the data from both the water and land tests, Langley and Boeing will install two anthropomorphic test dummies inside the capsule. This second series of land tests with a simulated test crew will help NASA and Boeing understand how land landings will impact the crew by directly measuring the accelerations from instrumentation within the dummies.

The test dummies represent a 105-pound woman and a 220-pound man and are currently being used for water impact tests of NASA’s Orion spacecraft, which are also conducted at Langley’s Hydro Impact Basin.

NASA’s Commercial Crew Program contracted Boeing and SpaceX to build the Starliner and Crew Dragon, respectively, as part of the effort to return America’s ability to launch crews to low-Earth orbit and the International Space Station. 

You Might Also Like


Filed Under: Aerospace + defense

 

LEARNING CENTER

Design World Learning Center
“dw
EXPAND YOUR KNOWLEDGE AND STAY CONNECTED
Get the latest info on technologies, tools and strategies for Design Engineering Professionals.
Motor University

Design World Digital Edition

cover

Browse the most current issue of Design World and back issues in an easy to use high quality format. Clip, share and download with the leading design engineering magazine today.

EDABoard the Forum for Electronics

Top global problem solving EE forum covering Microcontrollers, DSP, Networking, Analog and Digital Design, RF, Power Electronics, PCB Routing and much more

EDABoard: Forum for electronics

Sponsored Content

  • Widening the scope for machine tool designers with FORTiS™ enclosed encoder
  • Sustainability, Innovation and Safety, Central to Our Approach
  • Why off-highway is the sweet spot for AC electrification technology
  • Looking to 2025: Past Success Guides Future Achievements
  • North American Companies Seek Stronger Ties with Italian OEMs
  • Adapt and Evolve
View More >>
Engineering Exchange

The Engineering Exchange is a global educational networking community for engineers.

Connect, share, and learn today »

Design World
  • About us
  • Contact
  • Manage your Design World Subscription
  • Subscribe
  • Design World Digital Network
  • Control Engineering
  • Consulting-Specifying Engineer
  • Plant Engineering
  • Engineering White Papers
  • Leap Awards

Copyright © 2025 WTWH Media LLC. All Rights Reserved. The material on this site may not be reproduced, distributed, transmitted, cached or otherwise used, except with the prior written permission of WTWH Media
Privacy Policy | Advertising | About Us

Search Design World

  • Home
  • Technologies
    • ELECTRONICS • ELECTRICAL
    • Fastening • joining
    • FLUID POWER
    • LINEAR MOTION
    • MOTION CONTROL
    • SENSORS
    • TEST & MEASUREMENT
    • Factory automation
    • Warehouse automation
    • DIGITAL TRANSFORMATION
  • Learn
    • Tech Toolboxes
    • Learning center
    • eBooks • Tech Tips
    • Podcasts
    • Videos
    • Webinars • general engineering
    • Webinars • Automated warehousing
    • Voices
  • LEAP Awards
  • 2025 Leadership
    • 2024 Winners
    • 2023 Winners
    • 2022 Winners
    • 2021 Winners
  • Design Guides
  • Resources
    • Subscribe
    • 3D Cad Models
      • PARTsolutions
      • TraceParts
    • Digital Issues
      • Design World
      • EE World
    • Educational Assets
    • Engineering diversity
    • Trends
  • Supplier Listings
  • Advertise
  • Subscribe
We use cookies to personalize content and ads, to provide social media features, and to analyze our traffic. We share information about your use of our site with our social media, advertising, and analytics partners who may combine it with other information you’ve provided to them or that they’ve collected from your use of their services. You consent to our cookies if you continue to use this website.